Skip to content

Conversation

@syedriko
Copy link
Contributor

@syedriko syedriko commented Jan 7, 2026

OpenShift Lightspeed: remove lightspeed-console from Prow CI
The original PR: openshift/lightspeed-console#1301
JIRA: https://issues.redhat.com/browse/OLS-2321

@openshift-ci-robot openshift-ci-robot added the jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. label Jan 7, 2026
@openshift-ci-robot
Copy link
Contributor

openshift-ci-robot commented Jan 7, 2026

@syedriko: This pull request references OLS-2321 which is a valid jira issue.

Warning: The referenced jira issue has an invalid target version for the target branch this PR targets: expected the story to target the "4.22.0" version, but no target version was set.

Details

In response to this:

OpenShift Lightspeed: [UI] Switch to ubi9-minimal based image
Need a base image in Prow CI with microdnf.
The original PR: openshift/lightspeed-console#1301
JIRA: https://issues.redhat.com/browse/OLS-2321

Instructions for interacting with me using PR comments are available here. If you have questions or suggestions related to my behavior, please file an issue against the openshift-eng/jira-lifecycle-plugin repository.

@openshift-ci openshift-ci bot requested review from joshuawilson and xrajesh January 7, 2026 03:36
@openshift-ci openshift-ci bot added the approved Indicates a PR has been approved by an approver from all required OWNERS files. label Jan 7, 2026
@kyoto
Copy link
Member

kyoto commented Jan 7, 2026

/pj-rehearse

@openshift-ci-robot
Copy link
Contributor

@kyoto: now processing your pj-rehearse request. Please allow up to 10 minutes for jobs to trigger or cancel.

@syedriko
Copy link
Contributor Author

syedriko commented Jan 7, 2026

/pj-rehearse

@openshift-ci-robot
Copy link
Contributor

@syedriko: now processing your pj-rehearse request. Please allow up to 10 minutes for jobs to trigger or cancel.

@kyoto
Copy link
Member

kyoto commented Jan 7, 2026

/retest

@kyoto
Copy link
Member

kyoto commented Jan 7, 2026

/pj-rehearse pull-ci-openshift-lightspeed-console-pattern-fly-5-i18n
/pj-rehearse pull-ci-openshift-lightspeed-console-pattern-fly-5-lint

@openshift-ci-robot
Copy link
Contributor

@kyoto: now processing your pj-rehearse request. Please allow up to 10 minutes for jobs to trigger or cancel.

@openshift-ci-robot
Copy link
Contributor

@kyoto: requesting more than one rehearsal in one comment is not supported. If you would like to rehearse multiple specific jobs, please separate the job names by a space in a single command.

@kyoto
Copy link
Member

kyoto commented Jan 7, 2026

/pj-rehearse pull-ci-openshift-lightspeed-console-pattern-fly-5-i18n pull-ci-openshift-lightspeed-console-pattern-fly-5-lint

@openshift-ci-robot
Copy link
Contributor

@kyoto: now processing your pj-rehearse request. Please allow up to 10 minutes for jobs to trigger or cancel.

@syedriko syedriko force-pushed the syedriko-ols-2321 branch 2 times, most recently from 0ca01d8 to 20f0f86 Compare January 7, 2026 23:38
@openshift-ci openshift-ci bot removed the approved Indicates a PR has been approved by an approver from all required OWNERS files. label Jan 7, 2026
@syedriko syedriko force-pushed the syedriko-ols-2321 branch 4 times, most recently from c2da62f to a1d4050 Compare January 8, 2026 17:14
@syedriko syedriko changed the title OLS-2321: OpenShift Lightspeed: [UI] Switch to ubi9-minimal based image OLS-2321: OpenShift Lightspeed: remove lightspeed-console from Prow CI Jan 8, 2026
@openshift-ci-robot
Copy link
Contributor

openshift-ci-robot commented Jan 8, 2026

@syedriko: This pull request references OLS-2321 which is a valid jira issue.

Warning: The referenced jira issue has an invalid target version for the target branch this PR targets: expected the story to target the "4.22.0" version, but no target version was set.

Details

In response to this:

OpenShift Lightspeed: remove lightspeed-console from Prow CI
The original PR: openshift/lightspeed-console#1301
JIRA: https://issues.redhat.com/browse/OLS-2321

Instructions for interacting with me using PR comments are available here. If you have questions or suggestions related to my behavior, please file an issue against the openshift-eng/jira-lifecycle-plugin repository.

@openshift-ci-robot openshift-ci-robot added the rehearsals-ack Signifies that rehearsal jobs have been acknowledged label Jan 8, 2026
@xrajesh
Copy link
Contributor

xrajesh commented Jan 9, 2026

@openshift-ci openshift-ci bot added the do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command. label Jan 9, 2026
@openshift-merge-robot openshift-merge-robot added the needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD. label Jan 14, 2026
@openshift-ci
Copy link
Contributor

openshift-ci bot commented Jan 14, 2026

[APPROVALNOTIFIER] This PR is NOT APPROVED

This pull-request has been approved by: syedriko
Once this PR has been reviewed and has the lgtm label, please assign jmguzik, xrajesh for approval. For more information see the Code Review Process.

The full list of commands accepted by this bot can be found here.

Details Needs approval from an approver in each of these files:

Approvers can indicate their approval by writing /approve in a comment
Approvers can cancel approval by writing /approve cancel in a comment

@openshift-ci
Copy link
Contributor

openshift-ci bot commented Jan 14, 2026

@syedriko: The following tests failed, say /retest to rerun all failed tests or /retest-required to rerun all mandatory failed tests:

Test name Commit Details Required Rerun command
ci/rehearse/openshift/lightspeed-console/pattern-fly-5/i18n 12e9568 link unknown /pj-rehearse pull-ci-openshift-lightspeed-console-pattern-fly-5-i18n
ci/rehearse/openshift/lightspeed-console/pattern-fly-5/lint 12e9568 link unknown /pj-rehearse pull-ci-openshift-lightspeed-console-pattern-fly-5-lint

Full PR test history. Your PR dashboard.

Details

Instructions for interacting with me using PR comments are available here. If you have questions or suggestions related to my behavior, please file an issue against the kubernetes-sigs/prow repository. I understand the commands that are listed here.

@openshift-merge-robot openshift-merge-robot removed the needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD. label Jan 14, 2026
@openshift-ci-robot openshift-ci-robot removed the rehearsals-ack Signifies that rehearsal jobs have been acknowledged label Jan 14, 2026
@openshift-ci-robot
Copy link
Contributor

[REHEARSALNOTIFIER]
@syedriko: the pj-rehearse plugin accommodates running rehearsal tests for the changes in this PR. Expand 'Interacting with pj-rehearse' for usage details. The following rehearsable tests have been affected by this change:

Test name Repo Type Reason
pull-ci-openshift-lightspeed-operator-main-bundle-e2e-4-20 openshift/lightspeed-operator presubmit Ci-operator config changed
pull-ci-openshift-lightspeed-operator-main-ci-index-lightspeed-bundle-test openshift/lightspeed-operator presubmit Ci-operator config changed
pull-ci-openshift-lightspeed-operator-main-fips-image-scan-operator openshift/lightspeed-operator presubmit Ci-operator config changed
pull-ci-openshift-lightspeed-operator-main-generate openshift/lightspeed-operator presubmit Ci-operator config changed
pull-ci-openshift-lightspeed-operator-main-images openshift/lightspeed-operator presubmit Ci-operator config changed
pull-ci-openshift-lightspeed-operator-main-lint openshift/lightspeed-operator presubmit Ci-operator config changed
pull-ci-openshift-lightspeed-operator-main-security openshift/lightspeed-operator presubmit Ci-operator config changed
pull-ci-openshift-lightspeed-operator-main-unit openshift/lightspeed-operator presubmit Ci-operator config changed
periodic-ci-openshift-lightspeed-operator-main-bundle-e2e-4-19 N/A periodic Ci-operator config changed
periodic-ci-openshift-lightspeed-operator-main-bundle-e2e-4-20 N/A periodic Ci-operator config changed
periodic-ci-openshift-lightspeed-operator-main-bundle-e2e-4-16 N/A periodic Ci-operator config changed
periodic-ci-openshift-lightspeed-operator-main-bundle-e2e-4-17 N/A periodic Ci-operator config changed
periodic-ci-openshift-lightspeed-operator-main-bundle-e2e-4-18 N/A periodic Ci-operator config changed
Interacting with pj-rehearse

Comment: /pj-rehearse to run up to 5 rehearsals
Comment: /pj-rehearse skip to opt-out of rehearsals
Comment: /pj-rehearse {test-name}, with each test separated by a space, to run one or more specific rehearsals
Comment: /pj-rehearse more to run up to 10 rehearsals
Comment: /pj-rehearse max to run up to 25 rehearsals
Comment: /pj-rehearse auto-ack to run up to 5 rehearsals, and add the rehearsals-ack label on success
Comment: /pj-rehearse list to get an up-to-date list of affected jobs
Comment: /pj-rehearse abort to abort all active rehearsals
Comment: /pj-rehearse network-access-allowed to allow rehearsals of tests that have the restrict_network_access field set to false. This must be executed by an openshift org member who is not the PR author

Once you are satisfied with the results of the rehearsals, comment: /pj-rehearse ack to unblock merge. When the rehearsals-ack label is present on your PR, merge will no longer be blocked by rehearsals.
If you would like the rehearsals-ack label removed, comment: /pj-rehearse reject to re-block merging.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.

Projects

None yet

Development

Successfully merging this pull request may close these issues.

5 participants