Add Dockerfile linter (hadolint) to pre-commit (#708) #4428
main.yml
on: push
pre-commit
/
check-file-sizes
5s
Matrix: ubuntu / clang-build
Matrix: mac / clang-build
Matrix: ubuntu / gcc-build
Matrix: windows / msvc-build
Matrix: ubuntu / clang-sanitizer-build
Matrix: ubuntu / clang-test
Matrix: ubuntu / gcc-test
Matrix: ubuntu / clang-sanitizer-test
Matrix: ubuntu / clang-test-extended
Matrix: ubuntu / gcc-test-extended
Matrix: ubuntu / clang-sanitizer-test-extended
perf
/
macos-clang-build-perf-stats
perf
/
ubuntu-gcc-build-perf-stats
pages
/
deploy-pages
Annotations
7 errors and 6 warnings
|
mac / clang-build (Release)
Process completed with exit code 1.
|
|
mac / clang-build (Debug)
The strategy configuration was canceled because "mac.clang-build.Release" failed
|
|
windows / msvc-build (Debug)
The process 'C:\Program Files\Git\bin\git.exe' failed with exit code 128
|
|
windows / msvc-build (Debug)
Fetched in submodule path '3rdparty/libenvpp', but it did not contain 86db27f6df18a6e6a6ed143833bca0fd20977bf4. Direct fetching of that commit failed.
|
|
windows / msvc-build (Debug)
unable to access 'https://github.com/ph3at/libenvpp/': Failed to connect to github.com port 443 after 21065 ms: Could not connect to server
|
|
windows / msvc-build (Release)
The strategy configuration was canceled because "windows.msvc-build.Debug" failed
|
|
ubuntu / clang-build (ubuntu-24.04-arm)
Docker login for 'ghcr.io' failed with exit code 1
|
|
ubuntu / gcc-build (ubuntu-24.04, Release)
No files were found with the provided path: build/revert-list.txt. No artifacts will be uploaded.
|
|
ubuntu / clang-build (ubuntu-24.04-arm)
Docker login for 'ghcr.io' failed with exit code 1, back off 1.988 seconds before retry.
|
|
ubuntu / clang-build (ubuntu-24.04-arm)
Docker login for 'ghcr.io' failed with exit code 1, back off 1.884 seconds before retry.
|
|
ubuntu / clang-build (ubuntu-24.04-arm)
Back off 13.385 seconds before retry.
|
|
ubuntu / clang-build (ubuntu-24.04-arm)
Failed to download action 'https://api.github.com/repos/actions/checkout/tarball/8e8c483db84b4bee98b60c0593521ed34d9990e8'. Error: The request was canceled due to the configured HttpClient.Timeout of 100 seconds elapsing.
|
|
ubuntu / gcc-test-extended (ubuntu-24.04)
Docker login for 'ghcr.io' failed with exit code 1, back off 9.119 seconds before retry.
|
Artifacts
Produced during runtime
| Name | Size | Digest | |
|---|---|---|---|
|
ubuntu-clang-install-ubuntu-24.04
|
2.41 MB |
sha256:b36480bbba2743dc095406409f5b8996db9223df5dd4bbcb4ae162aca1f07c1e
|
|
|
ubuntu-gcc-debug-install-ubuntu-24.04
|
16.9 MB |
sha256:48a33c56f97af1d888d990be8e655cee30f31c96ee9c1aac2a89416fd40115cc
|
|
|
ubuntu-gcc-debug-install-ubuntu-24.04-arm
|
16.7 MB |
sha256:339f87ac76afda3877c3421c8091092af4122252f1355dab8fde9cb436f5a0b0
|
|
|
ubuntu-gcc-install-ubuntu-24.04
|
3.2 MB |
sha256:163e5d7df3c877319a6741296cb7828f8b26ff1761cadcf474e66cca31b4dba8
|
|
|
ubuntu-gcc-install-ubuntu-24.04-arm
|
2.98 MB |
sha256:29750d4e5756245ff322278027aa2041245d5dec5be1435e03d2c60955efeda5
|
|
|
windows-clang-install
|
1.9 MB |
sha256:ab67515525c56c2547b04345421314a33e4aac7084bae8a818629dc5858e09ff
|
|