Skip to content

fix: incorrect link of flamegraph and URI #413

fix: incorrect link of flamegraph and URI

fix: incorrect link of flamegraph and URI #413

Triggered via pull request January 16, 2026 13:27
Status Failure
Total duration 2m 40s
Artifacts

ci.yml

on: pull_request
Matrix: bazel-build
Matrix: bazel-integration-tests
Matrix: cmake-build
Matrix: cmake-integration-tests
Fit to window
Zoom out
Zoom in

Annotations

6 errors
bazel-integration-tests (instrumentation, ubuntu-latest)
Process completed with exit code 1.
bazel-integration-tests (walltime, codspeed-macro)
The strategy configuration was canceled because "bazel-integration-tests.instrumentation_ubuntu-la" failed
cmake-integration-tests (walltime, codspeed-macro)
The strategy configuration was canceled because "cmake-integration-tests.instrumentation_ubuntu-la" failed
cmake-integration-tests (instrumentation, ubuntu-latest)
Process completed with exit code 2.
cmake-integration-tests (off, ubuntu-latest)
The strategy configuration was canceled because "cmake-integration-tests.instrumentation_ubuntu-la" failed
cmake-integration-tests (off, ubuntu-latest)
The operation was canceled.