feat: add perf walltime support #106
Annotations
5 errors
|
bazel-integration-tests (instrumentation, ubuntu-latest)
Process completed with exit code 1.
|
|
bazel-integration-tests (off, ubuntu-latest)
Process completed with exit code 1.
|
|
bazel-integration-tests (off, ubuntu-latest)
The strategy configuration was canceled because "bazel-integration-tests.instrumentation_ubuntu-la" failed
|
|
bazel-integration-tests (walltime, codspeed-macro)
The operation was canceled.
|
|
bazel-integration-tests (walltime, codspeed-macro)
The strategy configuration was canceled because "bazel-integration-tests.instrumentation_ubuntu-la" failed
|